SWSS Unified App
SWSS InfraX
Pre-launch
Section
SWSS Unified App
Product documentation
Type
Guide
Technical reference
Summary
The consumption layer behind the Compute Deed: what is metered, what the telemetry projects, and why more consumption means more work rather than a larger payment.
SWSS Unified App

The single application through which a member holds, moves and participates across the SWSS ecosystem — one verified identity, one portfolio, and every product settling on the same layer rather than a separate account per product.

Open SWSS App →These guides describe the application as a member uses it.
Article Content

SWSS InfraX is the consumption provider that sits behind the Compute Deed. It serves compute and infrastructure capacity to workloads across the SWSS ecosystem, meters what those workloads consume, and records that consumption against the deeds attached to the capacity that served it. The screen inside the SWSS Unified App is where a holder reads that record.

Two quantities are telemetered together on that screen, and the relationship between them is the single thing a holder needs to understand: consumption is measured, and expected earning is derived from it. One is a record of what happened. The other is a projection of what is available to be taken up.

What Is Metered

Consumption is a measured quantity, not an estimate and not a self-report. Capacity served to a workload is metered at the point it is served, attributed to the deeds attached to that capacity, and closed off at a period boundary. What a holder sees for the current period is an accumulating figure; what they see for a closed period is a settled one. Nothing about a closed period changes afterwards.

What the Telemetry Shows

ReadingWhat it is telling you
ConsumptionMetered capacity served against your attached deeds for the period, the measured quantity everything else on the screen is derived from.
Attached deedsWhich Compute Deeds are attached, and therefore which consumption is attributed to you at all.
Expected earningA projection of the reward available to you if you take up and complete the work that this level of consumption funds. It is a projection of opportunity, not a statement of an amount owed.
PeriodThe boundary the readings are measured between. A figure without its period is not a figure.

From Consumption to Reward, In Order

The chain has four links, and skipping any of them produces the wrong conclusion about the third.

  1. Capacity is consumed and metered. Workloads consume infrastructure; InfraX measures it.
  2. Metered consumption sizes what InfraX generates. More capacity consumed is more settlement activity through the product.
  3. That activity funds the programme of work. Marketing and advertising deliverables are commissioned against it, a larger programme when consumption is higher, a smaller one when it is lower.
  4. A holder performs a deliverable and is paid on verification. The reward is payment for completed, verified work, recorded on chain against the delivery.

What rises with consumption is the volume of work offered to a holder, not an amount paid per deed. A period of heavy consumption is a period in which more deliverables are available to take up. A holder who takes up none of them is paid nothing in that period, whatever the telemetry recorded.

What Expected Earning Is Not

It is not an entitlement, a balance, a yield, a distribution or a quotation. No Compute Deed holder is paid for holding a deed, and the deed conveys no share of the revenue the infrastructure produces. The projection describes work that exists to be done, and it is displayed next to consumption because consumption is what determines how much of that work there is.

This is also why the Compute Deed remains an Acquisition Credit and is not changed into something else by this screen. It is a value declared at issuance and contributed toward an acquisition; the earning described here runs alongside that and is common to every deed class, not a property of this one.

Where the Work Is Taken Up

Nowhere on this screen. Every task across the ecosystem, the deliverables funded by InfraX consumption included, appears on Earn SWSS, which is the one place work is offered, accepted and recorded. A holder never goes to a product to find work.

What Decides Eligibility and Rate

The documentation you execute, not this page. Which deliverables are open to you, what each pays, and any cap that applies are commercial terms that reach a member through executed documentation. They are deliberately not restated here, a rate published in a guide is wrong the moment it moves, and a member who acted on the guide rather than on the agreement was misled by us and not by the change.

Status

SWSS InfraX launches in Q2 2027. The consumption marketplace is reachable from inside the member interface ahead of that; the operational parameters governing the work programme are published through SWSS Governance rather than here.